close
+86 13527814016
info@gzhaisan.com
Search
Guangzhou Haisan Amusement Technology Co., Ltd.

Water park design steps

Water park design steps

From the beginning to the construction of the project, the water park design plan can be divided into the following seven stages:
1. Planning It was the original source of the project. Mainly for some preliminary thinking of the water park project, including: analysis of higher-level conditions, theme positioning, market positioning, site selection, intention layout mode, basic content planning, etc.

2. Feasibility study At this stage, the feasibility of project planning is verified technically and economically, including policy research, market analysis, planning program research, preliminary investment estimation, financial analysis, impact analysis, and risk analysis, etc., are important links in determining whether the project is established.

3. Master plan After the location is determined, the overall layout and arrangement of the base in time and space will be carried out. At this stage, it is necessary to clarify the scope of land use, land use indicators, building requirements, and supporting facilities.

4.Concept design After the project is settled, the concrete water park design plan is formally invested. Settlement theme story, architectural style, floor plan, moving line setting, water play project configuration, business / service / management facility configuration.

5. Scheme design Continuing the conceptual design stage, comprehensively launching various water park design work, and carrying out special design for architecture, exterior, interior, landscape, lighting, and electrical.

6. Initial design Based on the design of the plan, the façade, size, color, etc. are clarified, and details are marked.

7, construction drawings Implement all design results into construction documents for construction bidding and subsequent construction guidance.

Related News
  • How to seize market Opportunities Quickly in the Three or Four Line City without Water Park Project?

    How to seize market Opportunities Quickly in the Three or Four Line City without Water Park Project?

    October 31, 2017In the three or four line city without water park project, as long as the main city population is more than two hundred thousand, there are huge market opportunities. The developers of water park shou...view
  • Studying to Build a Water Park

    Studying to Build a Water Park

    July 6, 2017If you don’t have the market draw in your location, building a waterpark too big will increase your expenses, but not your revenues. If you build it too small, you may not have the amenities to attra...view
  • How to Revolutionize Indoor Water Parks in the Future?

    How to Revolutionize Indoor Water Parks in the Future?

    September 25, 2023With the prevalence of complex commercial supply chains and the strong development of children's economy, children's entertainment has become a "solid job" in people's minds, esp...view
  • How to avoid dangers in water parks?

    How to avoid dangers in water parks?

    January 15, 2018In order to avoid the damage caused by the facilities to people during the visit, it is very important for manufacturers to avoid such dangers from the respect of water park equipment. Let me tell you...view
  • Do not ignore water park maintenance

    Do not ignore water park maintenance

    September 7, 2017In order to extend the life of the water park equipment and increase the quality of the water park equipment, in the process of water park equipment management, the staff should use and maintain the e...view
  • Preparation Work Before Opening Water Park

    Preparation Work Before Opening Water Park

    May 28, 2018The operation of a water park can retain visitors and make long-term development or not depends on the satisfaction of tourists which is a very important item. Therefore, to the old and new operators ...view
Online Servicetq_online